Engineering tools for cleaner manufacturing handoff
Use these resources to catch handoff risk before RFQ: file and package validation, the open handbook, and BOM procurement tooling.
Dannie EMS Handbook for production teams and design handoff.
Open documentation from Golden Data Pack rules to SMT, QMS, and supply execution practices used on active factory lines.
Open resource
Gerber viewer for pre-RFQ manufacturing checks.
Check copper, mask, paste, and drill alignment before RFQ to reduce file-package defects on first release.
Open resource
IPC-2581 and ODB++ viewer for unified handoff packages.
Validate modern package integrity in browser before quote release, without EDA install overhead.
Open resource
BOM Optimizer for supply exposure before line release.
Score BOM risk, surface qualified alternates, and expose lead-time pressure before procurement lock.
Open resource